Continuing with the work from the 2024 exercise within the 'Ruta del Agua', vegetation that had re-invaded the ravine's basin, the resting areas, and the access points is being cleared. Stairs that had been buried have been uncovered and recovered, and the old wall is being repaired and painted.
Next to the small house, the ground has been leveled with a fill of boulders and draining material to facilitate water evacuation. The work will be completed with the installation of a metal railing and non-slip platforms on the walkway to improve user safety.
The aim of these improvements is to maintain this natural recreational environment, highly frequented by the municipality's residents, in good condition, while simultaneously reducing fuel load in a public forest space.