FGV contracts TRAM Alicante maintenance for 21.7 million euros

The new contract, with a duration of three years extendable, will include all fleet units and new trams.

Generic image of a modern tram interior with empty seats and large windows, showing a blurred Mediterranean cityscape through the glass.
AI

Generic image of a modern tram interior with empty seats and large windows, showing a blurred Mediterranean cityscape through the glass.

The Consell has authorized Ferrocarrils de la Generalitat Valenciana (FGV) to initiate procedures for the contracting of preventive and corrective maintenance of TRAM de Alicante's rolling stock for an amount of 21,761,370.45 euros, VAT included.

The contract will have a duration of three years, with the possibility of two annual extensions. The short-cycle preventive maintenance includes the inspection of all onboard components, elements, and installations, with special attention to safety elements such as the bodywork, lighting, air conditioning, security and surveillance equipment, doors, pantographs, filters, and brakes. For its part, corrective maintenance will cover repairs derived from breakdowns and incidents.
Currently, FGV has 37 units in circulation on the Alicante network: 9 TRAM-trains for Line 1 (Luceros-Benidorm); 22 trams of the 4200 series for Lines 2, 3, 4, and 5; and 6 electro-diesel trains for Line 9 (Benidorm-Dénia). Additionally, 6 new Stadler 4500 series trams will be incorporated soon, which will also be included in this contract.
The main objective is to maintain the fleet in the best possible condition to ensure greater performance, safety, and quality in the rail transport service. The new contract will also include the maintenance of the electro-diesel trains and the new 4500 series trams, taking into account the increase in units, kilometers traveled, and the age of the rolling stock.
Based on information from the official source: TRAM d'Alacant (20/11/2026)