The tender is being processed through a simplified open procedure and is divided into two lots. The first lot, for Torremendo, has a budget of 170,078.40 euros (VAT included) and involves the adaptation of approximately 475 meters of the CV-925 road, from Orihuela to the sports center. The project includes the creation of a new pedestrian pathway, renovation of existing sidewalks, and adaptation of ramps and pedestrian crossings to accessibility regulations. It also plans for the replacement of lighting with LED technology, improved signage, and conditioning of the cemetery parking area.
These actions will complete the pedestrian route in an area connecting the urban center with various facilities and services, where currently there are deteriorated sidewalk sections and discontinuities forcing pedestrians to walk close to the road.
The second lot, for San Bartolomé, has a budget of 99,549.35 euros (VAT included) and covers the improvement of access from the CV-91 road via Alicante street, up to its intersection with Juan Carlos I street. The works include the renovation and expansion of sidewalks where their width is less than two meters, adaptation of pedestrian crossings, and renovation of the road surface.
Additionally, part of the existing tree line that hinders pedestrian traffic will be reorganized and replaced, the current curb will be modified to widen the pedestrian space, and a protective railing will be installed. The project also includes improvements to public lighting using LED technology.
Both projects aim to enhance accessibility and road safety in these access areas through pavement renewal, adaptation of pedestrian spaces, and existing infrastructure upgrades. The planned execution period for each lot is two months.